Skip to content
The Talbot PatriotEaston, MarylandMD

State & Region

State Starts $9.9 Million Pedestrian Safety Work on Route 50 in Easton

MDOT is adding sidewalks, signalized crossings, raised medians, and turn lanes along 1.7 miles of US 50, with finish expected fall 2027.

Route 50 sidewalk work with cones in Easton
AI-generated illustration; not a photograph of Route 50 sidewalk work with cones in Easton.

The state highway that cuts Easton in half is getting sidewalks and crossings that should have been there already.

The Maryland Department of Transportation has begun a $9.9 million pedestrian-safety project along a 1.7-mile stretch of US 50 in Easton. The work adds sidewalks, signalized crossings, raised medians, and extended turn lanes. Westbound construction near Bartlett Avenue is underway first. The full project is expected to finish in fall 2027.

Drivers should plan for periodic single-lane closures on weekdays for the duration of the work.

US 50 is a state road. The Maryland Department of Transportation owns the schedule and the budget. For Talbot residents who walk, bike, or drive that corridor every day, the local stake is concrete: safer crossings where the highway divides neighborhoods and businesses.

The Talbot County Council does not control the contract. It does control how the county tracks construction impacts on adjacent roads and whether residents know when closures hit. That is the board that has to stay on this until the last median is poured.

Source: WMDT

Drawn from public records; drafted with AI and edited by Peter Gorman before publication.

Correction? Contact the editor.Our AI use

about 150 words

If the button fails, email talbotpatriot [at] proton.me with the same fields.

Signed comments are held for review, then published. Obvious spam is rejected before it reaches the editor. Letters and comments.

No published comments yet.