Skip to content
The Talbot PatriotEaston, MarylandMD

Schoolhouse Notes

MCAP Proficiency Rose in 2026. The District Still Trails the State — and Spent $2.7 Million of Reserves to Hit a Salary Floor.

On MCAP, proficient means meeting or exceeding the state standard. Talbot reached 46.8% in ELA and 20.7% in math; the state was 51.7% and 27.1%.

School hallway of lockers in late-afternoon light, no people
AI-generated illustration; not a photograph of School hallway of lockers in late-afternoon light, no people.

Maryland released 2025–26 MCAP results in July. On the Maryland Comprehensive Assessment Program, proficient means a student met or exceeded the grade-level standard. Talbot County reached 46.8 percent proficiency in English language arts and 20.7 percent in math, against state figures of 51.7 and 27.1.

Both local numbers went up. Over four years, Talbot's ELA proficiency has gained 3.7 points and math 5.3.

The remaining gap is real, and it is wider in math. Talbot sits roughly six and a half points below the state in math and about five below in ELA. Caroline County, next door, gained 9.9 points in ELA and 9.7 in math over the same four years — the largest combined gains on the mid-Shore, from a starting point below Talbot's.

The Board of Education adopted an FY27 unrestricted operating budget of $84.6 million, up about $3 million from FY26, closing an original gap of $10.4 million. It used $2.7 million of fund balance to do it, drawing on a reserve of roughly $8 million.

A large share of the increase went to step raises plus roughly 5 percent increases so Talbot meets the $60,000 minimum starting teacher salary that the Blueprint for Maryland's Future requires. A state mandate sets the salary floor. The county sets the revenue. The difference comes out of reserves, which are finite.

Superintendent Sharon Pepukayi has described the FY27 budget as a reflection of values. The arithmetic is plainer: a district cannot use fund balance to close a structural gap more than a few times, and FY28 arrives with the reserve smaller and the Blueprint's costs still rising.

County capital added $1.8 million this year for an Easton Middle roof and Education Center exterior work. Enrollment continues to decline, which reduces some costs and reduces state aid faster.

Source: Maryland State Department of Education

Drawn from public records; drafted with AI and edited by Peter Gorman before publication.

Correction? Contact the editor.Our AI use

about 150 words

If the button fails, email talbotpatriot [at] proton.me with the same fields.

Signed comments are held for review, then published. Obvious spam is rejected before it reaches the editor. Letters and comments.

No published comments yet.