Skip to content
The Talbot PatriotEaston, MarylandMD

Local Business

Easton Moves ADU Zoning Amendments Toward State Law and Task Force Goals

Engage Easton page: town must amend Article X so accessory dwelling units can be permitted where single-family homes are allowed; ZoneCo flags owner-occupancy and parking rules as compliance gaps.

Single-family house lot illustrating accessory dwelling unit zoning concept
AI-generated illustration; not a photograph of Single-family house lot illustrating accessory dwelling unit zoning concept.

EASTON, MARYLAND — Follow the zoning text, not a brochure.

Easton’s Engage Easton project page on Accessory Dwelling Units — Zoning Update says the town is amending Article X of its Zoning Code so ADUs can be permitted in any zone where single-family detached homes are allowed. The page ties the work to two clocks: coming into compliance with new state ADU legislation, and carrying out strategies from the Town of Easton’s Attainable Housing Task Force.

What an ADU is on the town sheet. An accessory dwelling unit is a second dwelling either inside or added to an existing single-family detached house, or in a separate accessory structure on the same lot, with its own cooking, eating, sanitation, and sleeping space. The Task Force frame on the page is incremental housing supply, lower-cost options for workers and seniors, and aging in place.

ZoneCo’s compliance notes, as Easton summarizes them. The consulting review says “granny flat” language is outdated; owner-occupancy should not be required for the primary or accessory unit — Easton currently requires the owner to occupy the primary dwelling; and additional parking should not be required when the primary dwelling already has adequate off-street parking, or when on-street parking within 500 feet can cover the need. The Task Force also floats a “Junior ADU” idea inside an existing footprint or attached garage with a separate entrance, possibly sharing a bathroom — a concept the page says state law does not address and that may need more research.

The Engage project page does not post an approved ADU count, a fee schedule, or a hearing date.

Source: Town of Easton

Drawn from public records; drafted with AI and edited by Peter Gorman before publication.

Correction? Contact the editor.Our AI use

about 150 words

If the button fails, email talbotpatriot [at] proton.me with the same fields.

Signed comments are held for review, then published. Obvious spam is rejected before it reaches the editor. Letters and comments.

No published comments yet.